235 – Continued

More engine prep included cleaning up the valve cover for paint.  The 235 Thriftmaster decal peeled off pretty easily.  Sanded it with with some 120grit to blend out the paint chips.

New 235 New 235 New 235 New 235

As with most of the rust covered parts I used electrolysis to get clean up the engine parts.  It was particularly useful on the manifold and fan.

New 235 New 235 New 235 New 235 New 235

Once I started to reassemble the engine, progress was more obvious.  Closer inspection of the cylinders revealed that there was very little ridge at the top, indicating very little wear backing up the <400 mile claim.

New 235 New 235 New 235 New 235 New 235 New 235 New 235 New 235 New 235

I bought a set of new standard sized rod bearings and they all fit within spec.

New 235 New 235 New 235 New 235

New seal in the timing cover using a spare piston to support the cover while I pressed the new seal in.

New 235 New 235 New 235 New 235

Oil pump reassembled and installed.  This pump is from a car engine and the pickup pivots.

New 235 New 235 New 235 New 235 New 235 New 235

Oil pan gaskets installed with sealant at the corners joining the front and back rubber seals.

New 235 New 235 New 235 New 235 New 235

The harmonic ballancer is from the 216 and was used so I could maintain the 3/8″ pulley width and use the generator / waterpump setup.  It had a significant wear groove in it so a speedy sleeve was installed.   Red locktite was used to keep it from slipping.

New 235 New 235 New 235 New 235 New 235

With the lower half setup, it was time to install the head.  Two longer head bolts with the head cut off made for good guide pins.  The mating surfaces were cleaned with brake cleaner and then blown clean with air.  The copper gasket was sprayed with a sealant on both sides and allowed to setup before installation.

New 235 New 235 New 235 New 235 New 235 New 235

Pushrods inserted, rockers installed, side cover and gasket, valve cover gasket installed, valve cover. READY FOR PAINT!

New 235 New 235 New 235 New 235 New 235 New 235 New 235 New 235 New 235

PAINT!!  This is The Filling Stations Dark Grey.  Had to pick up reducer and hardener, mixed it and off to the races!

New 235 New 235 New 235 New 235 New 235 New 235 New 235 New 235 New 235 New 235

Dirty work done I primed the oil pump and tested my seals!

 And finally the first start!!

2 thoughts on “235 – Continued

    • Thanks David!

      Work has come to an abrupt stop this summer. We’ve sold our house and moved out of the city. I finally have a heated barn to resume work in once we move in November!

Leave a Reply